Why is there no single price?
A few cement sheets on a garage roof and lagging around pipes in a plant room are completely different jobs. The cost depends on what the material is, how much of it there is, where it is and what condition it’s in. That’s why we price each job individually, and quotes are free and come with no obligation.
Does the type of asbestos change the cost?
Yes, more than anything else. Under the Control of Asbestos Regulations 2012 (CAR 2012), lower-risk materials such as asbestos cement in good condition are handled differently from higher-risk materials like sprayed coatings, pipe lagging and most insulation board. Higher-risk work needs more controls, more time and has to be notified to the HSE before it starts, which all adds to the cost.
How much there is, and where it is
More material means more time and more waste. Access matters too: a roof that needs scaffolding, a tight loft or a ceiling void takes longer than an open garage. The condition counts as well, because damaged or crumbly material needs more care to contain.
Do I need a test or survey first?
If you’re not sure it’s asbestos, a test is the cheapest first step. If it comes back clear, there’s nothing to remove. Before building work, a refurbishment and demolition survey shows exactly what needs to come out, so the quote is based on facts rather than guesswork.
Disposal is part of the price
Asbestos waste can’t go in a skip or to the tip. It’s bagged, carried and disposed of through licensed routes, and that cost should always be included in a proper quote.
What a proper quote should include
The removal itself, containing the work area, cleaning down afterwards, carrying and disposing of the waste, and the paperwork that shows where it went. If a quote looks very low, check which of these are missing.


